Employer: National Railway Infrastructure Company (NRIC), Bulgaria
Period: March 2007 – August 2008
Project goals:
Completing the construction of the doubled and electrified railway line with increased traffic capacity in the section Karnobat – Sindel.
Scope of the project:
Transgeo Ltd. performed, as a subcontractor of "Eurotransproject" Ltd. the following activities:
- Analysis of the technical condition of the railway track;
- Technical design for parts Railway and Geodesy;
- Development of variants for parts Buildings and Power supply;
- Strengthening of weak spots along the line;
- Analysis and optimization of the existing doubled railway sections - benchmarking;
- Design of sections and elements of the railway line infrastructure;
- Assessment of the possibilities of usage of Public-private partnership;
- Cost-benefit analysis and financial efficiency analysis;