Employer: Ministry of transport, communications and information technologies, Bulgaria
Period: September 2007 – October 2009






Project goals:

Modernization of Corridor IV, link to the new bridge over the Danube River at Vidin-Calafat.


Scope of the project:

Transgeo Ltd. performed, as a subcontractor in Consortium IBERINSA - ILF Consulting Engineers- INECO - TRANSSYSTEM – Geotechengineering the following activities:

  • Preliminary study;
  • Preliminary design for parts Railway, Structures, Buildings;
  • Geodesy for the design phases.