Employer: National Railway Infrastructure Company (NRIC), Bulgaria
Period: June 2009 – August 2010






Project goals:

Recovery of the design parameters of the railway line Rousse - Varna, improvement of the technical condition of the railway infrastructure elements.


Scope of the project:

Transgeo Ltd. as a subcontractor of consortium "Eurotransproject" - NET Engineering, carried out an analysis of the existing layout and designing works in the phase of Technical design for parts: Railway, Buildings and Geodesy.


Highlights:
  • Revision and optimization of the existing railway line layout;
  • Repairing works of the existing structures;
  • Budget documentation.