Employer: National Railway Infrastructure Company (NRIC), Bulgaria
Period: July 2011- November 2016






Project goals:

Increasing the design speed up to 160 km/h, upgrading by subsystems and achieving interoperability.


Scope of activities:

Design and build contract for the following activities in the design phase:
  • Research and analysis of the preliminary design;
  • Technical design for modernization;
  • Detailed design for modernization;
  • Author’s supervision and as-built documentation;

As a subcontractor of PORR Bau GmbH for designing activities in a design and build contract, Transgeo Ltd has carried out overall management of the design process as well as coordination and performance of the design activities.


Highlights:
  • Design and build of 1 station and 2 halts, including repair works/construction of premises for telecommunication equipment at Todor Kableshkov station;
  • Design and build of electrification of the railway infrastructure and connection of the systems of the catenary;
  • Complete modernization of traction substation Proslav with the construction of new transformer installations, a technical building and adjacent facilities;
  • Design and removal / reconstruction of intersections with technical infrastructure that are affected in any way by the construction;
  • Design and build of noise barriers in the urban areas;
  • Project for a new overpass at the site of an existing level-crossing in the area of Todor Kableshkov station.





.