Employer: National Railway Infrastructure Company (NRIC), Bulgaria
Period: September 2011 – March 2012
Project goals:
Renovation of existing railway infrastructure, strengthening and protection of slopes.
Scope of the project:
As a subcontractor of SE "Transport Construction and Restoration" for designing activities in an engineering contract, Transgeo Ltd. performed the following activities:
- Management of the designing activities;
- Design and coordination of all design parts;
- Control geodetic measurements during construction;
- Author’s supervision and preparation of as-built documentation
- Optimization in plan and profile of the existing railway line, analysis of gauge in tunnels №17 and 18;
- Repair of the existing drainage facilities, increasing of the construction height of the existing retaining walls, new platform element on Oselna halt;
- Strengthening and protection of slopes.